7 Issue Categories

Constructability
Review, Automated

Find coordination issues, code conflicts, and constructability problems before they become expensive change orders. AI analyzes every drawing for issues that experienced reviewers would catch.

0
Categories
4
Severity Levels
$1K+
Saved per Issue
Get Early Access
issues
MECH-042Duct conflicts with beam
ELEC-018Panel clearance violation
PLMB-029Drain slope insufficient
ARCH-103Door swing conflict
61 total2 critical12 high

See It In Action

Issues organized by severity. Filter, search, and click to see full details and recommendations.

constructability-review
2 Critical
IDIssueStatus
MECH-042
Duct conflicts with structural beam at Grid C-4
RFI
ELEC-018
Panel clearance does not meet NEC requirements
RFI
PLMB-029
Drain slope insufficient for kitchen equipment
RFI
ARCH-103
Door swing conflicts with adjacent door
STRC-015
Beam depth unclear at grid intersection
RFI
FIRE-008
Sprinkler head spacing exceeds maximum
6 of 61 issues4 need RFIs

Prioritized by Severity

Not all issues are created equal. Focus on critical issues that will stop your project.

Critical
2
3% of total
High
12
20% of total
Medium
28
46% of total
Low
19
31% of total

7 Issue Categories

Classified by type to route to the right team

18
Coordination
14
Specification
11
Code Compliance
8
Dimension
6
MEP
3
Structural
1
Accessibility

How It Works

Exoplans reads your construction documents like an experienced plan reviewer— but without the coffee breaks or missed details.

Multi-Discipline Analysis

Analyzes architectural, structural, MEP, and civil drawings together to catch cross-discipline coordination issues.

Code Compliance Checks

Flags potential code violations for ADA clearances, egress paths, fire ratings, and electrical requirements.

Coordination Conflicts

Identifies clashes between systems—ducts vs beams, pipes vs conduit, doors vs equipment.

Dimension Verification

Catches dimensional discrepancies, missing dimensions, and values that don't add up.

RFI-Ready Output

Issues that need clarification are flagged for RFI generation with context already gathered.

Real-Time Updates

Watch issues populate as analysis progresses. No waiting until the end to see results.

EXO|PLANS
Why It Matters

Every Issue Found Early is Money Saved

The average RFI costs $1,080 in direct labor alone. Issues caught during bidding are free to address. Issues found during construction become change orders.

Catches coordination conflicts between disciplines
Identifies spec inconsistencies before bid day
Flags items that need RFI clarification
61
Avg Issues per Plan Set

Related Resources

Ready to Catch Issues Before They Cost You?

Join the waitlist to be among the first to automate your constructability review process.

Get Early Access